Thursday, September 20, 2018

New bathroom

New bathroom in basement.
Yay... the lower level bathroom is finished and inspected. Nice big shower, lots of hot water. The work was done by Remodel USA. Contractors were exceptional and very professional and meticulous to do an exceptional job. Some changes after the original contract were granted at no extra charge. The outside walls were originally not planned to be covered, but were finished at no additional charge. They also added a linen closet and two extra ground fault outlets in the bathroom at no extra charge. Very happy and pleased. As with an construction project there's always some hick ups... all were handled without skipping a beat. #remodelusa